Type of the projectProject of completed interior renovation of an existing construction (Interior study, realization drawings of construction‘s modifications, realization drawings of tiles covering areas and bathrooms, design of electric installations and lighting arrangement, drawings of atypical furniture and selection of standardized furniture).
Status of the projectrealization
PlanningRULES, s.r.o.
Period of project11/2014 - 02/2015 (3 months)
Period of realization03/2015 - 04/2015 (1 month)
Interior design3.000 €
PhotosPeter Čintalan