Interior Gary Hall Center, Austria

Basic data

NameSwimming pool, wellness and fitness

LocationAustria

Type of the projectProject of completed interior into yet unrealized space (Interior study, realization drawings of construction’s modifications, realization drawings of tiles covering areas and bathrooms, design of electric installations and lighting arrangement, drawings of atypical furniture and selection of standardized furniture).

Status of the projectrealization

PlanningRULES, s.r.o.

Dates

Period of project08/2015 - 03/2016 (7 months)

Period of realization09/2016 - 02/2018 (17 months)

Prices

Interior design12.400 €

Statistics

Area (without balcony)620 m²