NameESET offices Aupark Tower
LocationAupark Tower, Bratislava, Slovakia
Type of the projectProject of completed interior renovation of an existing construction (Interior study, realization drawings of construction‘s modifications, realization drawings of tiles covering areas and bathrooms, design of electric installations and lighting arrangement, drawings of atypical furniture and selection of standardized furniture).
Status of the projectrealization
Period of project10/2019 - 09/2021 (23 months)
Period of realization04/2020 - 11/2022 (31 months)
PhotosBoysplaynice